Property Snagging in Dubai: The Handover Inspection Checklist and Your Rights

What snagging is, how to run a handover inspection on a new Dubai home, what a snagging company checks, and how the defects liability rules protect you.

By the Housira editorial desk · Updated · 7 min read

A white kitchen with an island and pendant lights

The short answer

  • Property snagging is a detailed inspection of a newly built home to find and record defects, so the developer fixes them before or shortly after you take the keys.
  • The best time to snag is at the pre-handover inspection, before you sign the handover documents or move furniture in.
  • Under Dubai Law No. 6 of 2019, developers must fix defective installations for 1 year from handover and structural defects for 10 years from the completion certificate.
  • A professional snagging company typically charges from around AED 500 for an apartment to AED 2,500 or more for a large villa, and uses tools such as thermal cameras and moisture meters.
  • Report every defect in writing, with photos and dates; an undocumented defect is much harder to get fixed later.

Property snagging is a systematic inspection of a newly built home to find, photograph and list defects — from cracked tiles and leaking joints to faulty wiring — so the developer fixes them. In Dubai it is done at handover, and the resulting “snag list” is your formal record of what must be repaired.

Every new building has snags. Most are cosmetic; a few are not. The difference between a smooth handover and years of arguing with a developer is usually whether the defects were documented properly at the start. This guide explains when to snag, what to check room by room, whether to hire a snagging company, and what Dubai law says about the developer's duty to fix defects after you move in.

What is snagging, and why does it matter in Dubai?

A snag is any defect or unfinished item in a new property: something damaged, missing, not working, or not built to the agreed specification. Snagging is the process of finding and recording them, and a snag list is the written report you give the developer. It matters most for off-plan buyers, who are seeing the finished unit for the first time, but it applies to any newly completed home, including villas and townhouses in new communities.

Snagging protects you in two ways. Practically, it gets defects fixed while the developer's contractors are still on site. Legally, it creates dated evidence that a problem existed at handover, which is exactly what you need if you later rely on the defects liability rules.

A white kitchen with an island and pendant lights
Kitchens and wet areas hide many of the costliest snags: poor sealing, leaks under units and uneven worktops.

When should you do a snagging inspection?

When a project is complete, the developer obtains a building completion certificate and invites buyers to handover. Most Dubai developers offer a pre-handover inspection appointment before you sign the handover documents and collect the keys. That is the moment to snag. Book it for daylight hours, ask for the power and water to be connected so you can test everything, and do it before any furniture or appliances go in — once the home is furnished, defects are harder to see and easier for a developer to attribute to you.

What should a snagging checklist include?

Use the table below as a room-by-room starting point. Take a notepad or phone, a torch, a spirit level, a phone charger (to test sockets), masking tape to mark defects and a camera. Photograph every issue with something in the frame for scale, and note the room and wall.

Room-by-room snagging checklist for a new Dubai home
AreaWhat to checkCommon defects
Walls and ceilingsPaint finish, cracks, straightness, signs of dampHairline cracks, uneven paint, stains from leaks
Floors and tilesLevel, grout, hollow tiles (tap them), skirtingChipped or hollow tiles, missing grout, lipping between tiles
Doors and windowsOpening, closing, locking, seals, glassDoors that stick or drop, scratched glass, poor window seals letting in dust and heat
KitchenCabinet doors and hinges, worktop, sink, appliances, sealantMisaligned doors, gaps in sealant, leaks under the sink, damaged appliances
BathroomsWater pressure, drainage, falls to drains, sealant, extractor fanSlow drains, ponding water, cracked sanitaryware, missing silicone
ElectricalEvery socket, switch and light; the distribution board; labelsDead sockets, reversed switches, unlabelled breakers
Air conditioningCooling in every room, noise, condensate drains, thermostatsWeak cooling, leaking units, dirty or missing filters
Balcony and terraceDrainage, railings, tiles, waterproofingWater pooling, loose railings, stained or cracked tiles
Villa exterior (if applicable)Roof, external walls, boundary walls, landscaping, garageCracked render, poor drainage, damaged paving

How do you snag a property step by step?

  1. Get the handover notice and paperwork. Read the developer's handover pack, the specification in your sales and purchase agreement and the list of included fittings.
  2. Book the inspection. Ask for a daylight slot with power, water and air conditioning running. Arrange a snagging company now if you are using one.
  3. Inspect systematically. Work room by room, top to bottom — ceiling, walls, windows, floors, fittings — then test every socket, tap, drain and AC unit.
  4. Record every defect. Photograph it, number it, note the location and describe it in plain words.
  5. Submit the snag list in writing. Send it through the developer's handover portal or by email and ask for a written acknowledgement and a target date for repairs.
  6. Re-inspect after repairs. Check each item has been properly fixed, not just covered up, and sign off only what is complete.
  7. Take handover, noting any outstanding items. Complete the final payment and utility connections — and, if the property is new to you, register with DEWA and, if you let it, Ejari.
  8. Keep watching during the first year. Some defects, such as leaks or AC faults, only appear in use or in summer heat. Report them in writing as soon as you notice them.

What are the most common snags in new Dubai homes?

Most snag lists are dominated by finishing defects, but a handful of issues come up again and again in Dubai because of the climate and the pace of construction. They are worth extra attention during your inspection.

  • Water leaks and poor waterproofing in bathrooms, balconies and under kitchen sinks, often showing as stains, bubbling paint or damp skirting.
  • Air-conditioning faults, such as weak cooling, noisy fan coil units and condensate drains that leak into ceilings. Test every unit for at least a few minutes.
  • Window and door seals that let in dust, heat and noise — important in a city where cooling is the largest summer bill.
  • Hollow or uneven tiles and gaps in grout and silicone, which can crack or let water through over time.
  • Electrical issues, including dead sockets, missing earth connections and unlabelled circuit breakers.
  • Incomplete items, such as missing fittings, unfinished paintwork or appliances not listed in your specification.

Should you hire a snagging company in Dubai?

You can snag a home yourself, and for a small apartment in a well-run building many owners do. A professional snagging company is worth considering for villas, larger apartments and any purchase where you are abroad at handover. Inspectors typically use thermal imaging cameras to find hidden leaks and poorly insulated spots, moisture meters, and gauges to test water pressure and levels, and they produce a formatted report developers are used to receiving. Fees are commonly reported from roughly AED 500 to AED 1,200 for an apartment and roughly AED 1,200 to AED 2,500 or more for villas and larger homes, depending on size.

  • Ask for a sample report to see how clearly defects are photographed and described.
  • Check what is included, such as thermal imaging, a re-inspection after repairs, and exterior or roof checks for villas.
  • Confirm they are independent of the developer and the agent who sold you the property.
  • Agree the timing so the report is ready before your handover appointment.

What is the defects liability period in Dubai?

Dubai law gives buyers of units in jointly owned buildings two statutory protections. Under Article 40 of Dubai Law No. 6 of 2019 on the ownership of jointly owned real property, the developer is liable to repair or replace defective installations for one year from the date the unit is handed over to the owner, and to remedy defects in the structural parts of the building for ten years from the date of the completion certificate. If an owner delays taking possession, the one-year period runs from the completion certificate instead — another reason not to postpone your handover inspection.

Separately, UAE federal law imposes decennial liability on contractors and supervising engineers for collapse and defects that threaten a building's stability or safety, for ten years from delivery of the works. This was long set out in Articles 880 to 883 of the 1985 UAE Civil Code; the new Civil Code, Federal Decree-Law No. 25 of 2025, which took effect on 1 June 2026, carries the regime forward in Articles 821 to 824, including a three-year window to bring a claim after collapse or discovery of the defect. That regime primarily governs the developer's claims against its contractor, but it is part of why structural failures are taken seriously. Your sales and purchase agreement may add its own warranty terms on top.

Defect protections for Dubai buyers (summary)
ProtectionWhat it coversHow longRuns from
Installations (Law No. 6 of 2019, Art. 40)Defective installations — e.g. plumbing, electrical, AC, fittings1 yearHandover of the unit (or completion certificate if the owner delays possession)
Structure (Law No. 6 of 2019, Art. 40)Defects in structural parts of the building10 yearsCompletion certificate
Decennial liability (UAE Civil Code)Collapse or defects threatening stability or safety10 years; claims within 3 years of discoveryDelivery of the works to the developer
Your SPA / developer warrantyWhatever the contract addsAs statedAs stated

What if the developer won't fix the snags?

Start by escalating in writing, attaching your snag list, photos and the developer's acknowledgement, and setting a reasonable deadline. For shared-area defects, involve the owners association and the property management company. If that fails, you can raise a complaint with the Dubai Land Department and its Real Estate Regulatory Agency, and serious or costly disputes may need a lawyer and, ultimately, the courts. The clearer your dated records, the stronger your case. If you are buying a completed resale unit instead, see our guide on how to buy property in Dubai for the checks that apply, and look at homes for sale or contact us if you need help arranging an inspection.

Frequently asked questions

What is property snagging in Dubai?

Property snagging is a detailed inspection of a newly built Dubai home to identify and record defects before or at handover. The result is a snag list — a written, photographed record of problems such as cracks, leaks, faulty wiring or poor finishes — which the developer is asked to fix. It also serves as evidence if you later rely on defect liability rules.

How much does snagging cost in Dubai?

Professional snagging companies in Dubai commonly charge from around AED 500 to AED 1,200 for an apartment, and from about AED 1,200 to AED 2,500 or more for villas and larger homes. Prices depend on size, the tools used — such as thermal imaging — and whether a re-inspection after repairs is included. Ask for a sample report before booking.

What is the defects liability period in Dubai?

Under Article 40 of Dubai Law No. 6 of 2019, developers must fix defective installations for one year from the date a unit is handed over, and structural defects for ten years from the building's completion certificate. Your sales and purchase agreement may add further warranty terms. Report defects in writing as soon as you find them.

When should I do a snagging inspection?

Do your snagging inspection at the developer's pre-handover appointment, before you sign the handover documents, make the final payment or move furniture in. Ask for power, water and air conditioning to be connected so everything can be tested, and book a daylight slot. Then re-inspect once the developer says repairs are complete.

Can I snag a property myself?

Yes. Many owners of smaller apartments snag their own homes using a checklist, a torch, a spirit level, a phone charger to test sockets and a camera. A professional snagging company adds thermal imaging and moisture readings that can reveal hidden leaks, which is more useful for villas, large units or buyers who cannot attend handover.

What happens if I find defects after handover?

Report them to the developer in writing straight away, with photos and dates. Installation defects are covered for one year from handover and structural defects for ten years from the completion certificate under Dubai Law No. 6 of 2019. If the developer does not respond, escalate in writing, then raise a complaint with the Dubai Land Department.